FILTER
Prikaži samo sadržaje koji zadovoljavaju:
objavljeni u periodu:
na jeziku:
hrvatski engleski
sadrže pojam:

BRIDGE BETWEEN CROATIA-BOSNIA TO BE CLOSED FOR RECONSTRUCTION

SLAVONSKI BROD/STARA GRADISKA, May 22 (Hina) - After several months of delay, the Stara Gradiska-Bosanska Gradiska border crossing between Croatia and Bosnia will be closed for all traffic as of Monday, May 24, due to the reconstruction of a bridge across Sava River. All traffic towards Bosnia has been redirected to the Dvor-Bosanski Novi border crossing, opened to traffic on Saturday. The bridge across the Sava was severely damaged after thunder activated an explosive placed on the bridge during the Flash liberation operation in 1995. Reconstruction will be carried out by Slavonski Brod-based "Djuro Djakovic" company and is expected to last six months.(hina) ha
SLAVONSKI BROD/STARA GRADISKA, May 22 (Hina) - After several months of delay, the Stara Gradiska-Bosanska Gradiska border crossing between Croatia and Bosnia will be closed for all traffic as of Monday, May 24, due to the reconstruction of a bridge across Sava River. All traffic towards Bosnia has been redirected to the Dvor-Bosanski Novi border crossing, opened to traffic on Saturday. The bridge across the Sava was severely damaged after thunder activated an explosive placed on the bridge during the Flash liberation operation in 1995. Reconstruction will be carried out by Slavonski Brod-based "Djuro Djakovic" company and is expected to last six months. (hina) ha

VEZANE OBJAVE

An unhandled error has occurred. Reload 🗙