SLAVONSKI BROD/STARA GRADISKA, May 22 (Hina) - After several months of delay, the Stara Gradiska-Bosanska Gradiska border crossing between Croatia and Bosnia will be closed for all traffic as of Monday, May 24, due to the
reconstruction of a bridge across Sava River. All traffic towards Bosnia has been redirected to the Dvor-Bosanski Novi border crossing, opened to traffic on Saturday. The bridge across the Sava was severely damaged after thunder activated an explosive placed on the bridge during the Flash liberation operation in 1995. Reconstruction will be carried out by Slavonski Brod-based "Djuro Djakovic" company and is expected to last six months.(hina) ha
SLAVONSKI BROD/STARA GRADISKA, May 22 (Hina) - After several months
of delay, the Stara Gradiska-Bosanska Gradiska border crossing
between Croatia and Bosnia will be closed for all traffic as of
Monday, May 24, due to the reconstruction of a bridge across Sava
River.
All traffic towards Bosnia has been redirected to the Dvor-Bosanski
Novi border crossing, opened to traffic on Saturday.
The bridge across the Sava was severely damaged after thunder
activated an explosive placed on the bridge during the Flash
liberation operation in 1995. Reconstruction will be carried out by
Slavonski Brod-based "Djuro Djakovic" company and is expected to
last six months.
(hina) ha