MOSTAR, 22 Aug (Hina) - The Stabilisation Force (SFOR) Hungarian engineering brigade on Friday started preparation works for the reconstruction of the Old Bridge (Stari most) in Mostar, the press office of the SFOR Multinational
Division for Sector South- East said in a statement Friday.
MOSTAR, 22 Aug (Hina) - The Stabilisation Force (SFOR) Hungarian
engineering brigade on Friday started preparation works for the
reconstruction of the Old Bridge (Stari most) in Mostar, the
press office of the SFOR Multinational Division for Sector South-
East said in a statement Friday. #L#
Mostar deputy mayor Safet Orucevic asked SFOR to
participate in underwater tests so that it could be established
whether some original parts of the bridge could be recovered from
the river Neretva. Orucevic also requested that engineers check
whether there is a way to remove the temporary pedestrian bridge
which is now connecting the two banks of the Neretva before
reconstruction works begin.
(hina) rm jn
221802 MET aug 97