( Editorial: --> 7396 )
DUBROVNIK, Oct 10 (Hina) - A newly reconstructed section of the
flight control tower at the Cilipi airport (Dubrovnik, south
Adriatic) was opened on Saturday.
During the first phase of reconstruction, 600 square metres of
office premises have been completed and flight control equipment
acquired.
Head of the flight control centre, Zeljko Pean, said an American
communications system DEMRO, as at the Washington airport, will be
installed in November.
The tower should be completely equipped by the end of the year, for
which the resources have been set aside from the government
budget.
(hina) lml
101557 MET oct 98
NBA: Zubac vrlo dobar u rekordnoj pobjedi LA Clippersa
Britanski premijer doputovao u Kijev, sastaje se sa Zelenskijem
Australian Open: Swiatek ekspresno
AO: Pavić i Dodig prošli prvo kolo, Mektić ispao
NBA: Rezultati
NHL: Rezultati
Nastavljena potraga za djetetom u Savi
Netanyahu zahvalio Trumpu i Bidenu na pomoći u jamčenju primirja i dogovoru o taocima
SKV: Svijet uz kavu
Borba protiv požara u Los Angelesu napreduje, jaki vjetrovi jenjavaju