( Editorial: --> 7396 )
DUBROVNIK, Oct 10 (Hina) - A newly reconstructed section of the
flight control tower at the Cilipi airport (Dubrovnik, south
Adriatic) was opened on Saturday.
During the first phase of reconstruction, 600 square metres of
office premises have been completed and flight control equipment
acquired.
Head of the flight control centre, Zeljko Pean, said an American
communications system DEMRO, as at the Washington airport, will be
installed in November.
The tower should be completely equipped by the end of the year, for
which the resources have been set aside from the government
budget.
(hina) lml
101557 MET oct 98
Najava događaja - sport - za subotu, 1. veljače
Tjedna najava događaja - sport - od 1. do 7. veljače
SKV: Hrvatska u 15,30 sati
SKV: Svijet u 15,30 sati
Triler "Frka" od 6. veljače u kinima širom zemlje
Šušnjar pozvao trgovce da cijene proizvoda budu i niže od onih koje je odredila Vlada
Svjetska premijera filma "Fiume o morte!" na festivalu u Rotterdamu
Dva nova izdanja nakladnika Vuković & Runjić
Muzička akademija: Premijera opere "Priroda i opera" 8. veljače
Inflacija u Njemačkoj oslabila na početku 2025.