FILTER
Prikaži samo sadržaje koji zadovoljavaju:
objavljeni u periodu:
na jeziku:
hrvatski engleski
sadrže pojam:

CAVIC: CONTRUCTION OF CORRIDOR VC REQUIRES PUBLIC TENDER

BANJA LUKA, Aug 23 (Hina) - The construction of corridor Vc requires an international tender, as such a contract cannot be awarded on the basis of promises and without a feasibility study, Republika Srpska President Dragan Cavic said in an interview with Banja Luka's "Nezavisne novine" daily of Saturday.
BANJA LUKA, Aug 23 (Hina) - The construction of corridor Vc requires an international tender, as such a contract cannot be awarded on the basis of promises and without a feasibility study, Republika Srpska President Dragan Cavic said in an interview with Banja Luka's "Nezavisne novine" daily of Saturday. #L# Cavic said that he was aware of Croatia's official stand about the matter and that relations between the two countries were being complicated over the issue. Corridor Vc is part of a highway to be built from Budapest to the Croatian seaport of Ploce, and it should run through Bosnia-Herzegovina. "This issue must be in the interest of both entities and Bosnia- Herzegovina. I consider it completely illogical to speak about awarding the concession for the whole corridor to the 'Bosmal' company," Cavic said. Cavic leaves open the possibility that another company, besides the privately owned Bosnian-Malaysian company, could offer more favourable conditions for the construction of the highway section. Bosmal has been mentioned for some time now as the company which could be awarded the contract without a public tender. (hina) rml

VEZANE OBJAVE

An unhandled error has occurred. Reload 🗙