SPLIT SHIPYARD DELIVERS BOAT TWO MONTHS BEFORE DEADLINE SPLIT, June 28 (Hina) - Two months before the deadline, the Split shipyard on Thursday delivered a 45,000 tonne ship to Greece's ship company, Angleique Shipping Limited, owned
by the European Navigation. The ship is a chemical tanker, 183 metres long which can obtain the speed of 16 knots. This is the second ship from a series of six tankers with US$28 million.(hina) it
SPLIT, June 28 (Hina) - Two months before the deadline, the Split
shipyard on Thursday delivered a 45,000 tonne ship to Greece's ship
company, Angleique Shipping Limited, owned by the European
Navigation.
The ship is a chemical tanker, 183 metres long which can obtain the
speed of 16 knots. This is the second ship from a series of six
tankers with US$28 million.
(hina) it