ZAGREB, 30 July (Hina) - The State Inspectorate has reported that the construction of a mini power plant at the source of the Una River near Gračac has a site permit, but not an assessment of acceptability related to the ecological network, and an entire series of inspections is being carried out after a wave of protests.
State Inspectorate: Construction at Una River not ecological network rating
Only logged-in users can see full content details